The third mini-hydro power plant, Sheen, is situated in Nuwera Eliya and was commissioned in mid-October 2008 with an installed capacity of 560Kw. Vidullanka is an investment partner and was the turnkey contractor with Elpitiya, a member of the Aitken Spence Group.
Technical Specification
Project Capacity
:
560 kW
Mean Annual energy supply
:
2.24 GWh
River catchment
:
Pundaluoya
Head
:
129 m
Channel Length
:
15 m
Penstock Length
:
1.1 km
Plant Factor
:
46 %
Commissioning Date
:
10th October 2008
Turbine Type 
:
1 Penton  @ 500 kW, 1 penton  60 kW
Hydro Power
Owned and Managed


Managed